Thomas & Betts TBM 2, 5, 8, or Hydraulic Tool No.Refer to procedure for specific items required for particular circumstance The PDU provides the transition from the large cables that run from the office power board to the smaller cables that provide power to the shelf assemblies. Office power is connected to the (PDU) which in turn connects to the backplane of the shelf assembly. The 9500 MPR radio operates on -48 Vdc input power. PrerequisiteĮstablish equipment or station ground in accordance with your company grounding requirements for all installations. This procedure provides instructions to route and connect the station ground cable to a standard or seismic rack, and to route and connect office battery power to the Power Distribution Unit (PDU). Go to the WebEML History screen (15 minute view) to check supporting data. See Figure 1-1 and Figure 2-2.īack to Top Ground and Battery Cabling Purpose Mount the PDU in the desired spot using four rack screws. On this page, we will provide Google Camera APK download links for all compatible Nokia Smartphones including the latest Nokia 3. #Nokia Webeml Download how to#No rack or shelf alarms are provided on the fuse panel. Download Google Camera APK for Nokia Smartphones & How to install. A front panel alarm LED is provided to indicate a blown fuse. An optional relay card is available that provides eight Form-C relay outputs for radio major and minor alarms. Battery input voltage can be 0.5 to 60 Vdc. Free nokia driver descargar download software at UpdateStar - Install the driver to establish a cable connection between your compatible Nokia phone and a compatible PC. The fuse panel provides fuses for up to four 9500 MPR shelves (sixteen 20 Amp fuses two A and B + and two A and B - per shelf) and two AUX shelves (eight 10 Amp fuses). One increment above the PDU is required for heat dissipation. Mounting the PDU requires three rack increments.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |